John Rust and Geoff Rothwell, "Optimal Response to a Shift in Regulatory Regime: The Case of the U.S. Nuclear Power Industry", Journal of Applied Econometrics, Vol. 10, Supplement, 1995, pp. S75-S118. README file for monthly nuclear operating data. There are 118 files, all zipped in the file rr-data.zip. These files came from a Unix system. Data set consists of 117 separate ASCII files on U.S. nuclear reactor monthly operating histories over the period 4/75 to 12/94 (start date is later than 4/75 if plant came online after 4/75 and ending date is earlier than 12/94 if plant was shut down prior to 12/94). In addition there is a summary file, NUKESUM.ASC, which provides summary information on non-time-varying characteristics of 121 U.S. nuclear power plants, including the 117 plants for which we have data on monthly operating histories. The reactor monthly operating history files (*.mon) have the following format: col 1 2 3 4 5 6 7 8 9 10 111213 14 ZION2 304 4 75 1 0 4 0.0 0.0 252.6 744.0 0 0 3 ZION2 304 4 75 2 0 5 0.0 0.0 338.9 672.0 0 0 2 ZION2 304 4 75 3 0 6 0.0 0.0 226.4 744.0 0 0 13 ZION2 304 4 75 4 0 7 0.0 0.0 247.5 720.0 0 0 3 Col 1: NAME Name of plant 2: ID NRC ID number of plant 3: NSS Nuclear steam supply system: 1 = Babcock and Wilcox 2 = Combustion Engineering 3 = General Electric 4 = Westinghouse 4: YEAR Year of observation 5: MONTH Month of observation 6: VINTAGE Vintage of reactor construction 0 = pre Three Mile Island design 1 = post Three Mile Island design 7: AGE Age of reactor in months 8: HREFUEL Hours in month spent in refueling 9: HPLANNED Hours in month spent in scheduled outages 10: HFORCED Hours in month spent in forced outages 11: HMONTH Total hours in month 12: SCRAMIN Scram in indicator 13: SCRAMOUT Scram out indicator 14: FOUTNUM Number of forced outages in the month Documentation for NUKESUM.ASC, a file containing non-time varying characteristics of 121 U.S. nuclear reactors. CODE FIRM CM CD CY THERM NP NET AE NSSS BUILDER TURB ST ARKA1 ARPL 12 19 74 2568 903 850 BECHTEL B&W BECHTEL WEST AR ARKA2 ARPL 3 26 80 2815 943 912 BECHTEL COMB BECHTEL GE AR ARNO1 IOEL 2 1 75 1658 565 538 BECHTEL GE BECHTEL GE IA CODE = NAME OF REACTOR FIRM = UTILITY CM = Commercial Operation Month CD = Commercial Operation Day CY = Commercial Operation Year THERM = Thermal Capacity NP = Nameplate rating of generator NET = NP - self consumed power AE = Architect Engineer NSSS = Nuclear Steam Supply System BUILD= General Contractor TURB = Turbine-Generator Set manufacturer ST = State